Atteris performed an assessment of the periodic survey data for the Angostura flowlines and pipelines.

The allowable span lengths were re-assessed to based on improved metocean data to provide an increased maximum allowable span length and reduce intervention requirements. Atteris provided span rectification scope definition, and supported the intervention work through execution to ensure the work was performed efficiently and a robust outcome was achieved for the client.
Background
The Angostura field Development is an oil and gas development located offshore the northeast coast of Trinidad. Ongoing span intervention is required due to the original design and intervention execution not providing a robust long term solution due to various issues including seabed scour, pipeline movements and support subsidence.
Work Performed by Atteris

Atteris reassessed allowable span lengths for all flowlines and pipelines to level 2 – consideration of fatigue. Periodic survey data was reviewed, and some specific spans that were either interacting or unacceptable based on level 2 analysis were analysed to level 3 – full FEA analysis to determine natural frequencies and mode shapes. Based on the results of the span analysis and assessment of the survey results, the span rectification scope was defined specifying correction method, location of placement, required height, etc for each location. Rectification methods considered included, gravel bags, mattresses, and grout bag supports, with the method defined for each span dependant on soil conditions and span configuration. In some locations where survey data was inconclusive a number of options were proposed.  Atteris supported the offshore execution of the span correction with additional input as required.

left arrow
right arrow
Download PDF
Share on facebook
Share on twitter
Share on linkedin
resources

Related Posts

Seawater Intake and Outfall
CASE STUDIES
Seawater Intake and Outfall
  • Tags:
  • Energy Transition
  • HDD
  • Shore Crossing
  • Tunnelling
Read More
Maitland to Burrup Subsea Corridor Assessment
CASE STUDIES
Maitland to Burrup Subsea Corridor Assessment
  • Tags:
  • Shore Approach
  • Shore Crossing
  • Subsea Pipeline
Read More
Simpson Pipeline – Decommissioning Stability Study
CASE STUDIES
Simpson Pipeline – Decommissioning Stability Study
  • Tags:
  • Decommissioning
  • On-bottom Stability
  • Subsea Pipeline
Read More