Decommissioning of FPSO Turret Mooring Buoy

Decommissioning of FPSO Turret Mooring Buoy

Benefits
Atteris’ dynamic analysis demonstrated that the turret mooring buoy of a client’s FPSO mooring system could be brought to the surface safely via the sequential release of the supported risers and mooring lines. This operation was proven to be achieved without the need for any corrective ballasting, simplifying the operation to minimise risk and expense.
The analysis also showed that 3 mooring lines should remain as these were critical to the stability of the buoy. This conclusion resulted in the amendment of the decommissioning strategy and improved safety of the operation.
Background
OrcaFlex analysis was performed to simulate the proposed decommissioning method for the FPSO turret mooring buoy which consisted of a 9-point mooring system and was located in 826 m water depth. The purpose of the analysis was to determine the response of the buoy as the supported risers and mooring lines are released in a predetermined sequence.
Work Performed by Atteris

The submerged depth of the disconnected FPSO turret mooring buoy and the configurations of the attached lazy wave risers and 9-point mooring lines were modelled in OrcaFlex to replicate the as-surveyed conditions. Based on the model, the following were determined:

  • The change in depth and stability of the spider buoy as the risers and mooring legs are released to complete the re-float for recovery procedure
  • The number of risers and / or mooring lines that require to be released to allow the buoy to float to the surface.
left arrow
right arrow
Download PDF
Share on facebook
Share on twitter
Share on linkedin
resources

Related Posts

Seawater Intake and Outfall
CASE STUDIES
Seawater Intake and Outfall
  • Tags:
  • Energy Transition
  • HDD
  • Shore Crossing
  • Tunnelling
Read More
Maitland to Burrup Subsea Corridor Assessment
CASE STUDIES
Maitland to Burrup Subsea Corridor Assessment
  • Tags:
  • Shore Approach
  • Shore Crossing
  • Subsea Pipeline
Read More
Simpson Pipeline – Decommissioning Stability Study
CASE STUDIES
Simpson Pipeline – Decommissioning Stability Study
  • Tags:
  • Decommissioning
  • On-bottom Stability
  • Subsea Pipeline
Read More