Wheatstone Nearshore Exit Pit Detailed Design

Wheatstone Nearshore Exit Pit Detailed Design

Benefits
Atteris employed in-house shore crossing expertise to complete the detailed design of the Wheatstone nearshore micro-tunnel exit pit. Qualitative erosion assessments demonstrated erosion mitigation measures recommended by the contractor were not required. This reduced the CAPEX of the shore crossing.
Background
The Wheatstone Development is located 225 km north of Onslow, WA, in 72 m water depth. Gas and condensate from the Wheatstone and Iago fields is transported to an LNG facility via a 44-inch trunkline. The Trunkline is housed in a 2 m diameter and 1.3 km long concrete tunnel at the shore crossing. The tunnel was terminated in a pre dredged and sand backfilled exit pit. The original shore crossing design by the construction contractor envisaged using graded rock as an erosion mitigation technique for the exit pit. This was flagged as a pipeline integrity risk during installation that required further investigation into the possibility for removal or substitution. Atteris was engaged to perform the detailed design of the exit pit, with the goal of optimising the design and removing the requirement for graded rock as an erosion mitigation measure.
Work Performed by Atteris

A review of the contractor’s design and construction methodology was completed. The comprehensive review used seabed stability and erosion assessments to assess the exit pit footprint, depth, slope gradients, backfill soil and tunnel loading.

An updated detailed design was completed with the following key design optimisations:

  • Removal of engineered granular rock backfill
  • Substitution of engineered sand backfill with borrow ground A2B material
  • Accommodation of necessary plant equipment
  • Contingency design
left arrow
right arrow
Download PDF
Share on facebook
Share on twitter
Share on linkedin
resources

Related Posts

Seawater Intake and Outfall
CASE STUDIES
Seawater Intake and Outfall
  • Tags:
  • Energy Transition
  • HDD
  • Shore Crossing
  • Tunnelling
Read More
Maitland to Burrup Subsea Corridor Assessment
CASE STUDIES
Maitland to Burrup Subsea Corridor Assessment
  • Tags:
  • Shore Approach
  • Shore Crossing
  • Subsea Pipeline
Read More
Simpson Pipeline – Decommissioning Stability Study
CASE STUDIES
Simpson Pipeline – Decommissioning Stability Study
  • Tags:
  • Decommissioning
  • On-bottom Stability
  • Subsea Pipeline
Read More