Atteris performed verification of the flexible flowline and umbilical installation analysis performed by Subsea 7. Through this work, Atteris provided additional confidence to the client by performing sensitivity analysis for the final laydown of the FMC UCON-H diverless connectors in the view of highlighting potential issues that may arise during this process. This allowed the client to work with the installation contractor to address the issues to minimise the risks of overstressing the connectors and interface hubs.
Background
The Persephone Field is located in approximately 126 m water depth, approximately 6.5 km NE of the North Rankin Complex and 135 km NNW of Karratha, WA. The Persephone subsea architecture will comprise of two wells tied-in to a subsea production manifold at a common drill centre location, via well jumpers. From the manifold, the production fluid will be transported to the North Rankin Complex, via a 12 inch flexible flowline into a rigid riser via the SE1 conductor slot on North Rankin A.
Work Performed by Atteris

Throughout the duration of the project, Atteris’ team of engineers:

  • Performed static analysis of start-up operation sequence and normal lay
  • Assessed the stability of lateral bends including feasibility of proposed loss loop and tie-in bends at FLET / Manifold
  • Performed dynamic analysis of normal lay operations considering a range of metocean conditions
  • Performed additional sensitivity analysis for the final laydown of the diverless connectors, highlighted potential risks in the procedure and provided recommendations for more detailed assessments by the contractor to minimise the risks.
left arrow
right arrow
Download PDF
Share on facebook
Share on twitter
Share on linkedin
resources

Related Posts

Seawater Intake and Outfall
CASE STUDIES
Seawater Intake and Outfall
  • Tags:
  • Energy Transition
  • HDD
  • Shore Crossing
  • Tunnelling
Read More
Maitland to Burrup Subsea Corridor Assessment
CASE STUDIES
Maitland to Burrup Subsea Corridor Assessment
  • Tags:
  • Shore Approach
  • Shore Crossing
  • Subsea Pipeline
Read More
Simpson Pipeline – Decommissioning Stability Study
CASE STUDIES
Simpson Pipeline – Decommissioning Stability Study
  • Tags:
  • Decommissioning
  • On-bottom Stability
  • Subsea Pipeline
Read More