Scroll downscroll down button
CP for Cased Pipelines in Shore Crossings – Challenges in Design

CP for Cased Pipelines in Shore Crossings - Challenges in Design

This paper presents an overview of cathodic protection (CP) validation techniques utilised in the project delivery of two recent cased pipeline installations at shore crossings in Australia. 

It discusses the complexities across changing electrolytes and details CP system calculations within casings. The practical limitations of existing CP monitoring equipment and the implications for the ongoing integrity management of pipelines within these installations are also discussed.
Download PDF
Share on facebook
Share on twitter
Share on linkedin
resources

Related Posts

Ningaloo Vision Mooring Analysis
CASE STUDIES
Ningaloo Vision Mooring Analysis
  • Tags:
  • Decommissioning
  • Dynamic Analysis
  • Dynamic Systems
Read More
Woollybutt Decommissioning Support
CASE STUDIES
Woollybutt Decommissioning Support
  • Tags:
  • Construction Support
  • Decommissioning
  • Dynamic Analysis
Read More
John Brookes Spool Replacement
CASE STUDIES
John Brookes Spool Replacement
  • Tags:
  • Construction Support
  • Dynamic Analysis
  • Subsea Pipeline
Read More