Revision of Pipeline Safety Cases and Operational Pipeline Management Plans

Revision of Pipeline Safety Cases and Operational Pipeline Management Plans

Benefits
Atteris updated pipeline safety cases and operational pipeline management plans for all of Quadrant Energy’s Varanus Hub pipelines. This work was required for compliance and the Formal Safety Assessment process that was applied provided assurance that risks were ALARP or being adequately managed.
Background
Atteris was engaged to provide engineering services based on our technical capability in this area.
The work required an understanding of regulations, pipeline safety cases, risk assessment processes and regulatory submission requirements.
Pipeline safety cases were delivered for licensed pipeline systems and operational pipeline management plans were delivered for non-licensed pipeline systems.
Work Performed by Atteris

The scope included:

  • Review of existing pipeline safety cases and operational pipeline management plans.
  • Collate and assess operations and integrity data from last document revisions.
  • Prepared and facilitated Formal Safety Assessment workshops.
  • Updated pipeline safety cases and operational pipeline management plans.
  • Provision of regulatory submissions technical support through to approvals.
left arrow
right arrow
Download PDF
Share on facebook
Share on twitter
Share on linkedin
resources

Related Posts

Maitland to Burrup Subsea Corridor Assessment
CASE STUDIES
Maitland to Burrup Subsea Corridor Assessment
  • Tags:
  • Shore Approach
  • Shore Crossing
  • Subsea Pipeline
Read More
Simpson Pipeline – Decommissioning Stability Study
CASE STUDIES
Simpson Pipeline – Decommissioning Stability Study
  • Tags:
  • Decommissioning
  • On-bottom Stability
  • Subsea Pipeline
Read More
Telstra Cable Crossing Design – Darwin Harbour
CASE STUDIES
Telstra Cable Crossing Design – Darwin Harbour
  • Tags:
  • On-bottom Stability
  • Subsea Pipeline
Read More