Scroll downscroll down button
On-Bottom Stability Analysis for a Pipeline on a Mobile Seabed

This paper describes the work performed to assess the stability of an existing pipeline off the North Weste

On-Bottom Stability Analysis for a Pipeline on a Mobile Seabed

This paper describes the work performed to assess the stability of an existing pipeline off the North Western coast of Western Australia. Originally, the pipeline was post-trenched (for stability), by ploughing. The plough formed an open v-shaped trench below the pipeline. Several years after the pipeline was installed, a severe cyclone caused significant changes to the seabed along the pipeline. The v-shaped ploughed trench is generally no longer visible with the trench backfilled in places and the pipeline exposed in others. In addition to this, the embedment profile either side of the pipeline was often found to be assymetrical, with higher embedment on one side of the pipeline relative to the other.

Current on-bottom stability guidelines and recommended practices do not account for the effects of assymetrical embedment and seabed mobility (Ref. 5). These two factors are believed to contribute significantly to the overall stability of the pipeline. Consequently, it was decided to use physical model testing to obtain a better understanding of hydrodynamic loading and changes in embedment over the duration of a design storm. The physical model testing was performed for various pipeline embedment profiles. The results of these 2D physical model tests were then applied to the 3D FEA on-bottom stability software, CORUS 3D
This paper provides a detailed description of the physical model testing program performed as part of the pipeline stability assessment. The method used to combine the results of the physical model testing and apply them to the 3D FEA on-bottom stability software is also presented.
Download PDF
Share on facebook
Share on twitter
Share on linkedin
resources

Related Posts

Maitland to Burrup Subsea Corridor Assessment
CASE STUDIES
Maitland to Burrup Subsea Corridor Assessment
  • Tags:
  • Shore Approach
  • Shore Crossing
  • Subsea Pipeline
Read More
Simpson Pipeline – Decommissioning Stability Study
CASE STUDIES
Simpson Pipeline – Decommissioning Stability Study
  • Tags:
  • Decommissioning
  • On-bottom Stability
  • Subsea Pipeline
Read More
Telstra Cable Crossing Design – Darwin Harbour
CASE STUDIES
Telstra Cable Crossing Design – Darwin Harbour
  • Tags:
  • On-bottom Stability
  • Subsea Pipeline
Read More